HAZE FILTRATION SYSTEM
SET OF WESP PLANTS FOR FOOD INDUSTRY


Almost 10 years ago the haze filtration project began, with the installation of our first Wet ESP plant in a well-known food industry based in Europe.

Now we are about to complete the fourth WESP plant for the same project.

Discover the steps of this long and successful collaboration, aimed at removing oil mist coming from aspiration hoods of the frying zone.

Our customer, that invested in WESP technology, can now produce crisps in the most environmental- friendly way, with low operational costs and low energy consumption!

The choice of keeping AWS Corporation as the supplier of these four wet precipitators is a big success for us, but also a big success for environment and a reliable, efficient, safe solution for our customer.

WESP technology is the most innovative solutions for many different industries, not food-related only!

Don’t hesitate to contact us and ask for an introductive presentation of our Wet Electrostatic Precipitator.

FIRST WESP PLANT ORDERED IN 2013

One of the first layout of the project, dated September 2013

Project delivered and completed in February 2014

  • Flowrate 25.000 Nm3/h wet
  • Inlet dust 1.500 mg/Nm3
  • Outlet dust 25 mg/Nm3
  • Material of construction: AISI 304L
  • Electrodes: AISI 316L

SECOND WESP PLANT ORDERED IN 2016

One of the first layout of the project, dated March 2016

Project delivered and completed in September 2016

  • Flowrate 12.500 Nm3/h wet
  • Inlet dust 1.500 mg/Nm3
  • Outlet dust 25 mg/Nm3
  • Material of construction: AISI 304L
  • Electrodes: AISI 316L

THIRD WESP PLANT ORDERED IN 2020

One of the first layout of the project, dated March 2020

Project delivered and completed in October 2020

  • Flowrate 12.500 Nm3/h wet
  • Inlet dust 1.500 mg/Nm3
  • Outlet dust 25 mg/Nm3
  • Material of construction: AISI 304L
  • Electrodes: AISI 316L

FOURTH WESP PLANT ORDERED IN 2021

One of the first layout of the project, dated January 2022 (Exact twin of the third WESP plant)

Project delivered in October 2022, under completion.
On the right: third + fourth WESP plants together

  • Flowrate 12.500 Nm3/h wet
  • Inlet dust 1.500 mg/Nm3
  • Outlet dust 25 mg/Nm3
  • Material of construction: AISI 304L
  • Electrodes: AISI 316L